Klondike ISD Phase II

RELATED LINKS
Out for Bid DocumentsUnder Construction

Job Contact:

Downloadable Documents

Klondike ISD Addendum 01.pdf

Klondike ISD Ph. II Architectural Set

Klondike ISD Ph. II Document Directory

Klondike ISD Ph. II Structural Set

Klondike ISD Ph.II Final Specs.pdf

Klondike ISD Ph.II MPE Set

Klondike ISD Phase II Addendum 02.pdf



Job Images


3/18/2010
installed water storage tank

4/2/2010
demolition at locker rooms

4/2/2010
demolition at large gym

4/23/2010
handicapped seating at gym

4/23/2010
demolition progress

6/11/2010
metal shop welding station

6/11/2010
classroom finishes.

6/17/2010
shop handwash area

6/30/2010

6/30/2010

6/30/2010